Oil & Gas Facilities: Navigating brownfield complexity
For upstream, midstream, and downstream facilities, we tackle the unknowns. Clients come to us when field conditions clash with IFC drawings, when RFIs cause 'stop-start' work, or when QA/QC paperwork falls behind. We bridge engineering intent to field reality, ensuring construction stays buildable and turnover doesn’t become a scramble. The benefit? Fewer RFIs, cleaner QA/QC status, faster closeout, and defensible as-builts for operations and future upgrades.

Above-Ground Systems: Constructability-driven execution that reduces RFIs and rework
From new builds and expansions to repairs and upgrades, above-ground systems and piping work demand disciplined execution and airtight documentation. We solve the common headaches—design packages that don’t reflect real field constraints, unclear weld/inspection status, and closeout packages that come together too late. Field Sync brings structure to field delivery and documentation so the work is not only completed, but provable at turnover. The result is clear QA/QC visibility, turnover built continuously (not at the end), and verified as-builts that support operations, future modifications, and traceable project records.

Energy Infrastucture
Compressor station upgrades and piping replacements often face high-density piping/instrumentation clashes, tight shutdown windows, and vendor package integration issues. We reduce brownfield uncertainty and keep tight windows from slipping by validating interfaces and sequencing closeout. Our clients benefit from reduced clash and fit-up risk using 3D scanning + point-cloud validation, smoother tie-ins, less commissioning chaos, and clear verification for operators on what was actually installed.

Industrial mechanical & piping: Synchronized from shop to field
When spool tracking gaps, field fit-up issues, or scattered QA/QC records create delays, we step in. We bring “shop-to-field-to-turnover” control, synchronizing fabrication, installation, inspections, and closeout for plants, terminals, and processing facilities. This translates to fewer fit-up issues and rework, better spool status accountability (fabricated → delivered → installed → signed off), organized QA/QC and inspection records for faster client acceptance, and progress you can prove.

Energy infrastructure upgrades: Mitigating brownfield risks
For brownfield modifications and expansions, unknown existing conditions and design-to-field disconnects often lead to change orders and schedule creep. We remove unknowns early and maintain execution discipline so upgrades don’t spiral into chaos. Our clients gain early identification of constraints via field validation, tighter constructability and issue resolution that protects schedule, better safety outcomes from reduced improvisation, and faster handover with complete closeout documentation for utilities and industrial sites.